BSU Memorial Hall Addition and Renovation
Minnesota State Colleges and Universities
Birchmont Drive Bemidji, MN 56601
General
Energy
Carbon
Water
Stormwater
Waste
Cost
IEQ
Stormwater Run-off
N/A
0.0
Zero runoff
1.8
Existing condition

<b>Stormwater run-off rate pre-settlement</b><br>0.07 cfs <b>Stormwater run-off rate pre-settlement</b><br>1.81 cfs
Stormwater run-off rates are shown in cubic feet per second (cfs) for pre-settlement site conditions, existing site conditions (pre-project), and designed site conditions, with the goal of having the design run-off rates minimized to at or below pre-settlement levels. For projects using Version 2.1 of the B3 Guidelines (entering the Schematic Design phase in the B3 Tracking Tool before May 1st, 2013) these rates are for the 100-year, 24-hour precipitation event. For projects using Version 2.2 of the B3 Guidelines, these rates are for the 10-year, 24-hour precipitation event.

<< Back to Case Studies Home

 B3 HomeB3 Home

 GuidelinesGuidelines

 SB 2030 Energy StandardSB 2030 Energy Standard

 BenchmarkingBenchmarking

 Energy Efficient OperationsEnergy Efficient Operations

 Post Occupancy EvaluationPost Occupancy Evaluation

Sponsors

Project Team

Case Studies Database

Admin Login

B3 Case Studies v3.3.0.3588