BSU Memorial Hall Addition and Renovation
Minnesota State Colleges and Universities
Birchmont Drive Bemidji, MN 56601
General
Energy
Carbon
Water
Stormwater
Waste
Cost
IEQ
Construction and Demolition Waste
25%
18.2%
0% to waste stream
100% to waste stream

<b>Total weight (in tons) of all project<br>construction and demolition waste</b><br>5,728.0 tons <b>Total weight (in tons) of all project<br>construction and demolition waste<br>that ended up in a landfill</b><br>1,043.0 tons
This graph compares the total weight of all construction, demolition, and land clearing debris (in tons) to the total weight of the waste that ended up in a landfill. The difference between the two bars indicates the amount of construction and demolition waste that was reused, recycled, and/or salvaged from the construction site.

<< Back to Case Studies Home

 B3 HomeB3 Home

 GuidelinesGuidelines

 SB 2030 Energy StandardSB 2030 Energy Standard

 BenchmarkingBenchmarking

 Energy Efficient OperationsEnergy Efficient Operations

 Post Occupancy EvaluationPost Occupancy Evaluation

Sponsors

Project Team

Case Studies Database

Admin Login

B3 Case Studies v3.3.0.3588