Minnesota National Guard Brooklyn Park Armory Renovation
Military Affairs
5500 85th Avenue North Brooklyn Park, MN 55443
General
Energy
Carbon
Water
Waste
Cost
Energy Consumption
37 kBtu/sf-yr
0
Net zero
126
Average building

Note: The graph below shows data submitted by the project team and has not undergone a third-party review.

<b>SB 2030 Standard</b><br>52 kBtu/sf/year <b>As Designed</b><br>37.38 kBtu/sf/year
This graph shows the project’s energy use intensity (EUI), measured in kilo (1,000) British Thermal Units per square foot per year (kBtu/sf/year). It shows the project-specific SB 2030 Energy Standard, the predicted EUI from the project’s energy model, and the actual annual EUI from meter readings (if available).
Energy Strategies
Domestic Hot Water
  • 95% or greater DHW Efficiency (Natural Gas Fueled)
  • Recirculating Hot Water Pump
HVAC
  • Economizer
  • Energy Recovery System (Including Heat Recovery)
  • High Efficiency Fans
  • Variable Speed Drives
Lighting
  • LED Lighting
  • Occupancy or Vacancy Sensors
  • Optimized Emergency Lighting
  • Reduced Lighting Power Density
Metering
  • Smart Meters
Occupant Control
  • Occupant Daylighting / Glare Control
  • Occupant Electric Lighting Control
Ventilation
  • Ventilation Compliant with ASHRAE 62
Fixtures
  • Low Flow Aerators (faucets) Under 1.0 gpm
Design
  • Design for Adaptability
  • Reuse Existing Building

<< Back to Case Studies Home

 B3 HomeB3 Home

 GuidelinesGuidelines

 SB 2030 Energy StandardSB 2030 Energy Standard

 BenchmarkingBenchmarking

 Energy Efficient OperationsEnergy Efficient Operations

 Post Occupancy EvaluationPost Occupancy Evaluation

Sponsors

Project Team

Case Studies Database

Admin Login

B3 Case Studies v4.2.0.4054