MSU Moorhead East Snarr Hall Renovation
Minnesota State Colleges and Universities
810 14th Street South Moorhead, MN 56563
General
Energy
Carbon
Water
Cost
MSU Moorhead East Snarr Hall Renovation
Renovation | 2018

East Snarr Hall, originally built in 1964, is a three-story residence hall on the campus of Minnesota State University Moorhead. The facility includes 198 student beds, as well community lounges, study spaces, and laundry. By replacing windows, original plumbing, and HVAC and electrical systems, there were plenty of opportunities to meet the project goal of improved energy efficiency. Replacing all windows and curtain walls improved the thermal performance of the building envelope. The mechanical system includes a high-efficiency Variable Refrigerant Flow cooling system coupled with a Dedicated Outdoor Air System with energy recovery. Heating is provided through the campus steam distribution system. All controls were upgraded and the heating pumps were provided with premium efficiency motors and controlled by variable frequency drives to maximize turn-down and efficiency. On the electrical side, best practices like LED lighting and occupancy sensors are complemented by a multi-level energy metering system that enables separately tracking electrical usage by mechanical loads, plug-loads, and lighting.

This project was a finalist for the 2018 Best of SB 2030 Award.

 

Project Details
LocationMoorhead, MN
Construction TypeRenovation
Building TypeHousing
OrganizationMinnesota State Colleges and Universities
OwnerUniversity of Minnesota, Moorhead
Building Area38,941 sf
Vegetated Area0.44 acres
Number Of Stories3
Year of Occupancy2018

Design Team
ArchitectBentz / Thompson / Rietow, inc.
Mechanical EngineerObermiller Nelson Engineering
Structural EngineerMeyer Borgman Johnson
Civil EngineerONE
ContractorMcGough
Commissioning AgentCommissioning Solutions
Energy ModelerObermiller Nelson Engineering
Electrical EngineerObermiller Nelson Engineering
Landscape ArchitectBentz / Thompson / Rietow, inc.
Building ManagerMinnesota State University Moorhead

95
35
18.75
Design Submission Status
Design Compliance
Operations Submission Status
Operations Compliance

<< Back to Case Studies Home

 B3 HomeB3 Home

 GuidelinesGuidelines

 SB 2030 Energy StandardSB 2030 Energy Standard

 BenchmarkingBenchmarking

 Energy Efficient OperationsEnergy Efficient Operations

 Post Occupancy EvaluationPost Occupancy Evaluation

Sponsors

Project Team

Case Studies Database

Admin Login

B3 Case Studies v4.2.0.4054