Maslowski Wellness & Research Center
Minnesota Department of Employment and Economic Development
17 Fifth St SW Wadena, MN 56482
General
Energy
Carbon
Water
Stormwater
Waste
Cost
Energy Consumption
144 kBtu/sf-yr
0
Net zero
360
Average building

<b>SB 2030 Standard</b><br>144 kBtu/sf/year <b>As Designed</b><br>144.11 kBtu/sf/year
This graph shows the project’s energy use intensity (EUI), measured in kilo (1,000) British Thermal Units per square foot per year (kBtu/sf/year). It shows the project-specific SB 2030 Energy Standard, the predicted EUI from the project’s energy model, and the actual annual EUI from meter readings (if available).