Chisago County Public Safety Center - Phase II: County Jail and Law Enforcement Center
Minnesota Department of Employment and Economic Development
15140 Per Road Center City, MN 55012
General
Energy
Carbon
Water
Stormwater
Cost
IEQ
Carbon Emissions
27 lbs/sf-yr
0
Net zero
40
Average building

Note: The graph below shows data submitted by the project team and has not undergone a third-party review.

<b>SB 2030 Standard</b><br>16 pounds CO2e/sf/year <b>As Designed</b><br>27.38 pounds CO2e/sf/year
The greenhouse gas emissions associated with the project’s annual energy use are calculated in pounds of carbon dioxide equivalents per square foot per year (lbs CO2e/sf/year). It shows the project-specific SB 2030 Carbon Standard, the predicted carbon emissions from the fuel mixture specified in the project’s energy model, and the actual annual carbon emissions calculated from meter readings (if available).
Energy Strategies
Appliances
  • All Available Appliances Energy Star Certified
Domestic Hot Water
  • 95% or greater DHW Efficiency (Natural Gas Fueled)
  • Recirculating Hot Water Pump
Envelope / Insulation
  • Shades or Overhangs
HVAC
  • 93% or Greater Unit Heaters Efficiency
  • Carbon Dioxide Occupancy Sensors
  • Carbon Monoxide Garage Ventilation Control
  • Economizer
  • Energy Recovery System (Including Heat Recovery)
  • High Efficiency Fans
  • In Floor Heating / Cooling
  • Variable Speed Drives
Lighting
  • Continuous Daylighting Controls
  • LED Lighting
  • Occupancy or Vacancy Sensors
  • Optimized Emergency Lighting
  • Provide Daylighting Through Side Windows
  • Provide Daylighting Through Skylights
Metering
  • Smart Meters
Operations
  • Operations Manual Created for Project
Daylighting
  • 85% or Greater of Continually Occupied Space is Daylit.
Fixtures
  • Low Flow Aerators (faucets) Under 1.0 gpm
Design
  • Design for Adaptability

<< Back to Case Studies Home

 B3 HomeB3 Home

 GuidelinesGuidelines

 SB 2030 Energy StandardSB 2030 Energy Standard

 BenchmarkingBenchmarking

 Energy Efficient OperationsEnergy Efficient Operations

 Post Occupancy EvaluationPost Occupancy Evaluation

Sponsors

Project Team

Case Studies Database

Admin Login

B3 Case Studies v4.1.0.4035