Chisago County Public Safety Center - Phase II: County Jail and Law Enforcement Center
Minnesota Department of Employment and Economic Development
15140 Per Road Center City, MN 55012
General
Energy
Carbon
Water
Stormwater
Cost
IEQ
Stormwater Run-off
8.0 ft3/sec
0.0
Zero runoff
12.0
Existing condition

<b>Stormwater run-off rate pre-settlement</b><br>10.74 cfs <b>Stormwater run-off rate pre-settlement</b><br>12.02 cfs <b>Stormwater run-off rate pre-settlement</b><br>8.04 cfs
Stormwater run-off rates are shown in cubic feet per second (cfs) for pre-settlement site conditions, existing site conditions (pre-project), and designed site conditions, with the goal of having the design run-off rates minimized to at or below pre-settlement levels. For projects using Version 2.1 of the B3 Guidelines (entering the Schematic Design phase in the B3 Tracking Tool before May 1st, 2013) these rates are for the 100-year, 24-hour precipitation event. For projects using Version 2.2 of the B3 Guidelines, these rates are for the 10-year, 24-hour precipitation event.
Water Strategies
Stormwater
  • Stormwater Management Plan

<< Back to Case Studies Home

 B3 HomeB3 Home

 GuidelinesGuidelines

 SB 2030 Energy StandardSB 2030 Energy Standard

 BenchmarkingBenchmarking

 Energy Efficient OperationsEnergy Efficient Operations

 Post Occupancy EvaluationPost Occupancy Evaluation

Sponsors

Project Team

Case Studies Database

Admin Login

B3 Case Studies v4.1.0.4035